Track Record
Results for Ward 5
Real projects. Real savings. Real infrastructure. Here's what four years of focused work looks like on the ground.
On the Ground
Featured Projects
Drainage Innovation: Faster, Smarter Solutions
Tested a new drainage improvement method that significantly accelerates ditch work. While not suitable for every location, the pilot was successful and opens the door to faster drainage solutions across Ward 5 where conditions allow.
Larger machine variant, demonstrating the drainage improvement method at scale.
Smaller machine variant, same method tested in tighter conditions.
Two machines were tested: a smaller unit and a larger machine, both demonstrating the viability of the approach. The final results speak for themselves.
Municipal 30 Bridge over the Seine: Repaired & Upgraded
Repaired the bridge on Municipal Road 30 over the Seine River, including installation of a new guard rail. The project also introduced a new sign design specifically engineered to allow farm equipment to cross safely without damage to the equipment or the bridge structure.
Repairing the bridge on Municipal 30 over the Seine River.
New guard rail installed for improved safety.
Custom signs designed so farm equipment can cross safely, protecting both the bridge and the machinery.
The custom farm-equipment crossing signs are a practical innovation, protecting both the bridge investment and the agricultural community that depends on it.
This Term
More Accomplished This Term
Taché Community Centre: $13.4M Secured in Grants
Secured $13.4 million in outside funding, covering 46% of the new Taché Community Centre and protecting local ratepayers from unnecessary municipal debt.
Centre of Canada Strategic Master Plan
Completed the Centre of Canada Strategic Master Plan and Tourism Plan, positioning the RM for long-term sustainable growth and economic opportunity.
Climate Adaptation Plan
Completed the RM of Taché Climate Adaptation Plan, a forward-looking framework to protect our rural communities and agricultural land for generations to come.
125+ Miles Dust Abatement RM-Wide
Applying Magnesium Chloride at 10,000 litres per mile across the RM's 125+ mile network of rural roads, keeping Ward 5 safe, liveable, and accessible.
4 New Ward 5 Developments Underway
Working with developers on 4 new projects in Ward 5, balancing growth with our rural character as Lorette, Landmark, and our communities evolve.
Commercial Growth Readiness Assessment
Completing the Readiness Investment Capacity Assessment Plan to prepare Ward 5 and all of Taché for responsible commercial growth that serves our community's long-term interests.
Looking Ahead
Priorities for the Next Term
Protecting Our Rural Character
Growth is coming and I'll make sure it happens on our terms. Working with developers to ensure new projects respect the look and feel of our rural communities.
Roads & Infrastructure
Continuing investment in gravel roads, dust abatement, and drainage, including expanding the innovative drainage methods piloted this term where conditions will allow.
Fiscal Accountability
Continued Discipline: I will continue maximizing federal and provincial grant opportunities for major infrastructure projects to protect ratepayers and minimize local debt, building on the $13.4M secured for the Community Centre.
Smart Commercial Growth
Completing the Readiness Investment Capacity Assessment to attract the right businesses and create opportunity without compromising what makes Ward 5 and Taché special.
Vote Marcel Manaigre • Ward 5
Advanced Polls October 21, 2026 Election Day October 28, 2026 8:00 AM - 8:00 PM Municipal Office 28007 Mun Road 52N, Dufresne